欧美一区二区三区不卡视频在线|亚洲一区二区三区AV激情|久久久久久久久国产毛片|亚洲三级电影在线看

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Lift platform
相關產(chǎn)品RELATED PRODUCTSMORE

Non standard customized lifting platform

Category:Lift platform

Product specifications:

Details

Fixed high load lift aircraft have a large weight, operate smoothly, and generally have a large worktable.

Simple and reliable operation, sturdy structure, easy installation and maintenance, and long service life.
The hydraulic system of the product is equipped with anti fall and synchronization devices.
According to user requirements, different tabletop forms such as tablets, rollers, and telescopic can be made.
Power outage can achieve manual descent, equipped with an emergency stop button, which is convenient, fast, and practical.

This product is mainly used in enterprise production lines, warehousing, logistics, shopping malls, stations, docks and other places.

The main rotating parts adopt wear-resistant composite shaft sleeves and needle roller bearings, which can reduce the wear between the support rod and the support rod pin, thereby extending the service life of the equipment.

Designed according to user requirements, the load capacity can reach 80T.

1. The hydraulic lifting platform (referred to as the platform) has been inspected before leaving the factory, and all technical indicators meet the design requirements. When in use, only the ground wire needs to be connected, and the hydraulic and electrical systems do not need to be adjusted.

2. Before using the platform, carefully check the hydraulic and electrical systems for any leakage or exposure.

3. The platform should be kept in an unloaded state before lifting. After the power is turned on, the power indicator light will turn on and the main stop button will be turned on; Press the motor start button..

4. Press the up (green) button and observe if the platform responds. Run the motor idle for 3-5 minutes. If it does not rise, reverse the motor, cut off the power, and exchange the two phase wires of the motor.

5. Press the up button (green indicator light on), and the platform will start to rise. After reaching the desired height, the platform will automatically stop (green light off). Then press the down button (yellow indicator light on), and the platform will start to descend. After reaching the original position, the solenoid valve will automatically power off (yellow light off).

If the platform needs to stop during the rising or falling process, press the stop button (red button).

7. Turn off the power after use.

One Precautions
During installation and use of the platform, the workbench should be kept level.
2. During the lifting process of the platform, it is strictly prohibited for any personnel to climb. If maintenance is required, the platform should be lifted and then
The platform must be firmly secured before proceeding
3. Overloading operations are strictly prohibited during the use of the platform, and the items carried should be placed in the middle of the workbench surface
Heart position must not be moved or biased.
4. The hydraulic oil used should be kept clean and free from water and other impurities.
When the platform malfunctions, the power supply should be cut off in a timely manner for maintenance.
II maintenance
1. The elevator is a scissor lift, and its rotating part is connected by a shaft pin and a shaft sleeve. In order to reduce friction, there is a grease nipple at the end of the shaft pin for adding lubricating grease. The platform must be lubricated after 80 hours or about 10 days of use.
2. After adding hydraulic oil to the elevator every 200 hours of operation, about 6 months, replace the hydraulic oil with a viscosity of 22-46mm/S; Hydraulic oil with high viscosity is used in high temperature working environments, and it must be filtered when refueling. Hydraulic oil is generally N46 in summer and N32 in winter.
After working for 80 hours, about 10 days, it is necessary to inspect the screw cap on the pin for looseness. If there is any looseness, it should be dealt with urgently.

Our factory is spacious and bright, with excellent production equipment and imported production line equipment,Our leading products include over ten series, including high-altitude work platforms, hydraulic lifts, lifting platforms, boarding bridges, electric flatbed trucks, hedge trimmers, railway bridges, and car lifts. Jinli adopts a flexible production system to meet customers' special requirements for the design and production of lifting platforms. In the design and production departments of Jinli, we are able to quickly provide solutions for a series of special requirements raised by customers. Our products have been successfully applied in many industries such as aerospace, aviation, nuclear power, logistics, pharmaceuticals, railways, chemicals, and automobiles.

Links

灵武市| 西和县| 融水| 湄潭县| 灌阳县| 和平县| 武安市| 邛崃市| 融水| 福清市| 柏乡县| 石泉县| 蒙城县| 潮安县| 安新县| 湖北省| 新营市| 丰都县| 平顶山市| 汶上县| 神木县| 越西县| 康马县| 泰宁县| 阿瓦提县| 陇西县| 丰顺县| 宜城市| 大城县| 喀什市| 浦县| 柏乡县| 寻甸| 宁强县| 克山县| 南汇区| 翁牛特旗| 崇明县| 郧西县| 横峰县| 建昌县|